Arts & ShowsOut & AboutOutdoors
Thu 24 Sep Nieuwe Meersluis
Watch a 235-tonne bridge deck hoisted over the Schinkel
The second bascule deck for the new Schinkelbrug arrives in Amsterdam by water and is lifted into position. Weighing 235 tonnes, this steel structure will be swung into place as the works are opened to the public.
- WhenThursday 24 September 2026
- WhereNieuwe Meersluis, IJsbaanpad near houseboat no. 135, Amsterdam
- CategoryWatch

