How to choose a general contractor in Amsterdam
Start with scope, not with a name: decide whether the job is a permit-free repair, a permit-requiring layout change, or a full renovation, since that decision shapes who you even need to call. For anything larger than a repair, run the plan through the municipality's Omgevingsloket permit check first β a contractor can advise on what a project needs, but the application itself is the homeowner's responsibility.
Ask every contractor for a fixed-price quote after they have seen the property in person, not an estimate over the phone. Material costs for imports and cabinetry have been rising, so a fixed price agreed early protects you from surprises mid-project.
If the work involves removing a load-bearing wall, adding steel beams, or any other structural change, ask who will provide the independent sign-off the Wet kwaliteitsborging voor het bouwen (Wkb) requires β this is separate from the contractor doing the building work. For smaller, non-structural jobs, our Amsterdam Handymen & Contractors listings cover that different scale of work.
Questions people ask
Do I need a permit for a renovation in Amsterdam?
It depends on the work: some projects need only a free notification, others need a permit, and some need both. Run your plans through the Omgevingsloket permit check to find out which applies, and check the planning rules for your specific address in Rules on the Map.
What does a permit cost and how long does it take?
A notification is free. A permit fee is based on total construction cost: 1.25% of the cost with a minimum of β¬100 for projects up to β¬75,000, calculated in cost brackets above that. The municipality usually decides within 8 weeks, up to 12 weeks if it needs advice from another organization, and up to 6 months for an extended procedure.
What does a full renovation cost in Amsterdam?
One industry source quotes total renovations as typically starting from around β¬1,000 per square metre, but that figure will vary with the scope and the property. Ask each contractor for a fixed-price quote based on a site survey rather than relying on a single benchmark number.
What is the Wkb and why does it matter for structural work?
The Wet kwaliteitsborging voor het bouwen requires an independent professional, engaged separately from your contractor, to sign off on structural building work. It applies once the Wkb is in full force for your type of project, so raise it with your contractor before work on load-bearing walls or beams begins.
Are there subsidies for making a renovation more energy efficient?
The ISDE scheme has expanded to include a ventilation bonus and premiums for sustainable, biobased insulation materials. Buyers adding recognized energy-saving measures can also use the Nationale Hypotheek Garantie (NHG), which in 2026 allows financing up to 106% of a property's post-renovation value on purchases up to β¬498,200.
Is it worth buying an older property to renovate rather than a finished one?
Properties with a lower energy label (E, F, or G) sell for less and let you design the layout from scratch, which is why full renovations of older Amsterdam housing stock are common. If you're weighing that route, our Amsterdam Real Estate Agents listings are the starting point for finding the property before you find the contractor.